Portfolio
- Muncie
- IN
Calibre served as the on-call civil engineer for the City of Muncie, Indiana, overseeing a...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Commerce City
- CO
Located in Commerce City, the Settlers Crossing project encompasses 163.39 acres and features 120 single-family...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Minneapolis
- MN
Calibre provided civil engineering services for the Fort Snelling National Cemetery, located in Minneapolis-Saint Paul,...
- Portland
- OR
Calibre provided structural engineering services for the VA Portland Healthcare System, located in Portland, Oregon....
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Aurora
- CO
Calibre Engineering collaborated with AECOM on a transformative Wastewater Master Plan for the City of...
- Pueblo
- CO
Calibre Engineering provided structural design services for the Pueblo Bluffs Multifamily Apartments. Spanning approximately 92,000...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Dallas
- TX
Calibre provided civil engineering services for the $28 million Phase 4 Expansion of the Dallas...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Durango
- CO
The Durango Whitewater Park is one of the country’s most utilized whitewater parks. Calibre’s Whitewater...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Little Rock
- AR
Located in Little Rock, Arkansas, the Eugene J Towbin Memorial Veterans Hospital is a significant...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)