Portfolio
- Lyons
- CO
Calibre’s Whitewater Team sought to enhance the Supply Irrigating Ditch Company’s diversion structure on St....
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Boise
- ID
Calibre’s Whitewater Team collaborated with McMillen Associates, the City of Boise, and Farmer’s Union Diversion...
- Ketchum
- ID
Calibre’s Whitewater Team led the development of the River Park Master Plan in Ketchum, Idaho,...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Dallas
- TX
Calibre provided civil engineering services for the $28 million Phase 4 Expansion of the Dallas...
- Oklahoma City
- OK
Calibre provided civil engineering services for the aircraft hangar at Tinker Air Force Base, Oklahoma,...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Durango
- CO
The Durango Whitewater Park is one of the country’s most utilized whitewater parks. Calibre’s Whitewater...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Cañon City
- CO
The Arkansas River is the main recreational attraction in Cañon City. Locals and visitors are...
- Erie
- CO
The I-25 Erie Gateway is a transformative 600-acre mixed-use development designed to be a vibrant,...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Box Elder – Rapid City is 10 miles away
- SD
Calibre provided civil design services for an 11,619 square-foot Explosive Ordinance Disposal (EOD) Facility addition...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Cleveland
- OH
Calibre completed a comprehensive assessment of the storm sewer system for the Louis Stokes Cleveland...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)