Portfolio
- Commerce City
- CO
Located in Commerce City, the Settlers Crossing project encompasses 163.39 acres and features 120 single-family...
- Kansas City
- MO
Calibre provided civil engineering services for the Kansas City VA Medical Center with an 11,601...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Denver
- CO
Calibre provided civil engineering services for the Meow Wolf building in Denver, Colorado, covering 90,000...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Dallas
- TX
Calibre provided civil engineering services for the $28 million Phase 4 Expansion of the Dallas...
- Denver
- CO
Situated in the vibrant heart of Downtown Denver, Calibre is proud to contribute to a...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Lyons
- CO
Calibre’s Whitewater Team played a pivotal role in the development of the South Saint Vrain...
- Aurora
- CO
Calibre undertook a comprehensive stormwater master planning project for the 1,200-acre Original Aurora area in...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Muncie
- IN
Calibre served as the on-call civil engineer for the City of Muncie, Indiana, overseeing a...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Ketchum
- ID
Calibre’s Whitewater Team led the development of the River Park Master Plan in Ketchum, Idaho,...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Box Elder – Rapid City is 10 miles away
- SD
Calibre provided civil design services for an 11,619 square-foot Explosive Ordinance Disposal (EOD) Facility addition...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Lyons
- CO
Calibre’s Whitewater Team played a key role in the successful recovery project following the devastating...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)