Portfolio
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Box Elder – Rapid City is 10 miles away
- SD
Calibre provided civil design services for an 11,619 square-foot Explosive Ordinance Disposal (EOD) Facility addition...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Denver
- CO
Calibre provided civil engineering services for the Meow Wolf building in Denver, Colorado, covering 90,000...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Denver
- CO
Calibre provided civil engineering services for the Meow Wolf building in Denver, Colorado, covering 90,000...
- Fort Collins
- CO
The Poudre River Park was developed to transform an abandoned diversion structure into a vibrant...
- Little Rock
- AR
Located in Little Rock, Arkansas, the Eugene J Towbin Memorial Veterans Hospital is a significant...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Tees Barrage
- UK
The Tees Barrage International White Water Centre is a groundbreaking project that showcases our commitment...
- Eagle
- CO
Eagle River Park is designed to attract summer visitors and promote outdoor recreation. Situated along...
- Lyons
- CO
Calibre’s Whitewater Team played a key role in the successful recovery project following the devastating...
- Commerce City
- CO
This project encompassed the repaving and construction of the parking lot, covering both the existing...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Erie
- CO
The I-25 Erie Gateway is a transformative 600-acre mixed-use development designed to be a vibrant,...
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Oklahoma City
- OK
Riversport Rapids Whitewater Center is the first pumped-park globally to offer a recreational, a competition,...
- Denver
- CO
Situated in the vibrant heart of Downtown Denver, Calibre is proud to contribute to a...
- Portland
- OR
Calibre provided structural engineering services for the VA Portland Healthcare System, located in Portland, Oregon....
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)