Portfolio
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Nottingham
- UK
The Holme Pierrepont National Watersports Centre is a premier facility that underwent a transformative upgrade...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Minneapolis
- MN
Calibre provided civil engineering services for the Fort Snelling National Cemetery, located in Minneapolis-Saint Paul,...
- Lyons
- CO
Calibre’s Whitewater Team sought to enhance the Supply Irrigating Ditch Company’s diversion structure on St....
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Montgomery
- AL
Nestled along the scenic Alabama River, Montgomery Whitewater spans over 100 acres and serves as...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Houston
- TX
The Houston Swiftwater Rescue Facility, which spans over 50,000 square feet, seeks to enhance water...
- Fort Collins
- CO
The Poudre River Park was developed to transform an abandoned diversion structure into a vibrant...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Aurora
- CO
Calibre Engineering collaborated with AECOM on a transformative Wastewater Master Plan for the City of...
- Commerce City
- CO
This project encompassed the repaving and construction of the parking lot, covering both the existing...
- Nottingham
- UK
The Holme Pierrepont National Watersports Centre is a premier facility that underwent a transformative upgrade...
- Little Rock
- AR
Located in Little Rock, Arkansas, the Eugene J Towbin Memorial Veterans Hospital is a significant...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Boise
- ID
Calibre’s Whitewater Team collaborated with McMillen Associates, the City of Boise, and Farmer’s Union Diversion...
- Tees Barrage
- UK
The Tees Barrage International White Water Centre is a groundbreaking project that showcases our commitment...
- Cañon City
- CO
The Cañon City River Whitewater Park focused on revitalizing the river ecosystem while enhancing recreational...
- Commerce City
- CO
This project encompassed the repaving and construction of the parking lot, covering both the existing...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)