Portfolio
- Lyons
- CO
Calibre’s Whitewater Team played a pivotal role in the development of the South Saint Vrain...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Oklahoma City
- OK
Calibre provided civil engineering services for the aircraft hangar at Tinker Air Force Base, Oklahoma,...
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Dallas
- TX
Calibre provided civil engineering services for the $28 million Phase 4 Expansion of the Dallas...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
- Dallas
- TX
Calibre provided civil engineering services for the $28 million Phase 4 Expansion of the Dallas...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Montgomery
- AL
Nestled along the scenic Alabama River, Montgomery Whitewater spans over 100 acres and serves as...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Little Rock
- AR
Located in Little Rock, Arkansas, the Eugene J Towbin Memorial Veterans Hospital is a significant...
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Berthoud
- CO
Located at the southeast corner of Mountain Avenue and Berthoud Parkway in Larimer County, Colorado,...
- Waltham Cross
- UK
Calibre’s Whitewater Team proudly contributed to the Lee Valley Whitewater Centre, the iconic venue for...
- Houston
- TX
The Houston Swiftwater Rescue Facility, which spans over 50,000 square feet, seeks to enhance water...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
- Denver
- CO
Calibre provided civil engineering services for this redevelopment on a 5.1-acre site, which included renovating...
- Boise
- ID
Calibre’s Whitewater Team collaborated with McMillen Associates, the City of Boise, and Farmer’s Union Diversion...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)