Portfolio
- Cleveland
- OH
Calibre completed a comprehensive assessment of the storm sewer system for the Louis Stokes Cleveland...
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Lyons
- CO
Calibre’s Whitewater Team sought to enhance the Supply Irrigating Ditch Company’s diversion structure on St....
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Oklahoma City
- OK
Calibre provided civil engineering services for the aircraft hangar at Tinker Air Force Base, Oklahoma,...
- Cleveland
- OH
Calibre completed a comprehensive assessment of the storm sewer system for the Louis Stokes Cleveland...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Montgomery
- AL
Nestled along the scenic Alabama River, Montgomery Whitewater spans over 100 acres and serves as...
- Box Elder – Rapid City is 10 miles away
- SD
Calibre provided civil design services for an 11,619 square-foot Explosive Ordinance Disposal (EOD) Facility addition...
- Oklahoma City
- OK
Calibre provided civil engineering services for the aircraft hangar at Tinker Air Force Base, Oklahoma,...
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
- Aurora
- CO
Calibre Engineering collaborated with AECOM on a transformative Wastewater Master Plan for the City of...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Aurora
- CO
Calibre Engineering collaborated with AECOM on a transformative Wastewater Master Plan for the City of...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Grand Canyon National Park
- AZ
Located in the picturesque North Rim area, this extensive infrastructure project spans vital water and...
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)