Portfolio
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Lyons
- CO
Calibre’s Whitewater Team played a key role in the successful recovery project following the devastating...
- Pueblo
- CO
Calibre Engineering provided structural design services for the Pueblo Bluffs Multifamily Apartments. Spanning approximately 92,000...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Portland
- OR
Calibre provided structural engineering services for the VA Portland Healthcare System, located in Portland, Oregon....
- Denver
- CO
Calibre provided civil engineering services for this redevelopment on a 5.1-acre site, which included renovating...
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Cañon City
- CO
The Cañon City River Whitewater Park focused on revitalizing the river ecosystem while enhancing recreational...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Denver
- CO
Calibre provided civil engineering services for the Meow Wolf building in Denver, Colorado, covering 90,000...
- Hamilton
- MT
Located in the heart of the NIH campus, the newly constructed Building J Microscopy Facility...
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Durango
- CO
The Durango Whitewater Park is one of the country’s most utilized whitewater parks. Calibre’s Whitewater...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)