Portfolio
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Lyons
- CO
Calibre’s Whitewater Team played a key role in the successful recovery project following the devastating...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Grand Canyon National Park
- AZ
Located in the picturesque North Rim area, this extensive infrastructure project spans vital water and...
- Aurora
- CO
Calibre Engineering collaborated with AECOM on a transformative Wastewater Master Plan for the City of...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Hamilton
- MT
Located in the heart of the NIH campus, the newly constructed Building J Microscopy Facility...
- Ketchum
- ID
Calibre’s Whitewater Team led the development of the River Park Master Plan in Ketchum, Idaho,...
- Boise
- ID
Calibre’s Whitewater Team collaborated with McMillen Associates, the City of Boise, and Farmer’s Union Diversion...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Lyons
- CO
Calibre’s Whitewater Team played a pivotal role in the development of the South Saint Vrain...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Hamilton
- MT
Located in the heart of the NIH campus, the newly constructed Building J Microscopy Facility...
- Oklahoma City
- OK
Riversport Rapids Whitewater Center is the first pumped-park globally to offer a recreational, a competition,...
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Aurora
- CO
Calibre Engineering collaborated with AECOM on a transformative Wastewater Master Plan for the City of...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Erie
- CO
The I-25 Erie Gateway is a transformative 600-acre mixed-use development designed to be a vibrant,...
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Cañon City
- CO
The Cañon City River Whitewater Park focused on revitalizing the river ecosystem while enhancing recreational...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Hamilton
- MT
Located in the heart of the NIH campus, the newly constructed Building J Microscopy Facility...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)