Portfolio
- Lyons
- CO
Calibre’s Whitewater Team played a key role in the successful recovery project following the devastating...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Eagle
- CO
Eagle River Park is designed to attract summer visitors and promote outdoor recreation. Situated along...
- Commerce City
- CO
Located in Commerce City, the Settlers Crossing project encompasses 163.39 acres and features 120 single-family...
- Oklahoma City
- OK
Riversport Rapids Whitewater Center is the first pumped-park globally to offer a recreational, a competition,...
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Waltham Cross
- UK
Calibre’s Whitewater Team proudly contributed to the Lee Valley Whitewater Centre, the iconic venue for...
- Eagle
- CO
Eagle River Park is designed to attract summer visitors and promote outdoor recreation. Situated along...
- Pueblo
- CO
Calibre Engineering provided structural design services for the Pueblo Bluffs Multifamily Apartments. Spanning approximately 92,000...
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Durango
- CO
The Durango Whitewater Park is one of the country’s most utilized whitewater parks. Calibre’s Whitewater...
- Fort Collins
- CO
The Poudre River Park was developed to transform an abandoned diversion structure into a vibrant...
- Cañon City
- CO
The Arkansas River is the main recreational attraction in Cañon City. Locals and visitors are...
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Aurora
- CO
Calibre Engineering collaborated with AECOM on a transformative Wastewater Master Plan for the City of...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Little Rock
- AR
Located in Little Rock, Arkansas, the Eugene J Towbin Memorial Veterans Hospital is a significant...
- Lyons
- CO
Calibre’s Whitewater Team played a pivotal role in the development of the South Saint Vrain...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Hamilton
- MT
Located in the heart of the NIH campus, the newly constructed Building J Microscopy Facility...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)