Our Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Cleveland
- OH
Calibre completed a comprehensive assessment of the storm sewer system for the Louis Stokes Cleveland...
- Grand Canyon National Park
- AZ
Located in the picturesque North Rim area, this extensive infrastructure project spans vital water and...
- Hamilton
- MT
Located in the heart of the NIH campus, the newly constructed Building J Microscopy Facility...
- Tees Barrage
- UK
The Tees Barrage International White Water Centre is a groundbreaking project that showcases our commitment...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Durango
- CO
The Durango Whitewater Park is one of the country’s most utilized whitewater parks. Calibre’s Whitewater...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Berthoud
- CO
Located at the southeast corner of Mountain Avenue and Berthoud Parkway in Larimer County, Colorado,...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Cleveland
- OH
Calibre completed a comprehensive assessment of the storm sewer system for the Louis Stokes Cleveland...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Eagle
- CO
Eagle River Park is designed to attract summer visitors and promote outdoor recreation. Situated along...
- Denver
- CO
Calibre provided civil engineering services for this redevelopment on a 5.1-acre site, which included renovating...
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Montgomery
- AL
Nestled along the scenic Alabama River, Montgomery Whitewater spans over 100 acres and serves as...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...