Portfolio
- Commerce City
- CO
This project encompassed the repaving and construction of the parking lot, covering both the existing...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Waltham Cross
- UK
Calibre’s Whitewater Team proudly contributed to the Lee Valley Whitewater Centre, the iconic venue for...
- Cañon City
- CO
The Arkansas River is the main recreational attraction in Cañon City. Locals and visitors are...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Eagle
- CO
Eagle River Park is designed to attract summer visitors and promote outdoor recreation. Situated along...
- Berthoud
- CO
Located at the southeast corner of Mountain Avenue and Berthoud Parkway in Larimer County, Colorado,...
- Boise
- ID
Calibre’s Whitewater Team collaborated with McMillen Associates, the City of Boise, and Farmer’s Union Diversion...
- Little Rock
- AR
Located in Little Rock, Arkansas, the Eugene J Towbin Memorial Veterans Hospital is a significant...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Denver
- CO
Calibre provided civil engineering services for the Meow Wolf building in Denver, Colorado, covering 90,000...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Fort Collins
- CO
The Poudre River Park was developed to transform an abandoned diversion structure into a vibrant...
- Aurora
- CO
Calibre undertook a comprehensive stormwater master planning project for the 1,200-acre Original Aurora area in...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Eagle
- CO
Eagle River Park is designed to attract summer visitors and promote outdoor recreation. Situated along...
- Oklahoma City
- OK
Calibre provided civil engineering services for the aircraft hangar at Tinker Air Force Base, Oklahoma,...
- Lyons
- CO
Calibre’s Whitewater Team played a key role in the successful recovery project following the devastating...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Oklahoma City
- OK
Riversport Rapids Whitewater Center is the first pumped-park globally to offer a recreational, a competition,...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)