Portfolio
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Lyons
- CO
Calibre’s Whitewater Team played a pivotal role in the development of the South Saint Vrain...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Berthoud
- CO
Located at the southeast corner of Mountain Avenue and Berthoud Parkway in Larimer County, Colorado,...
- Cañon City
- CO
The Cañon City River Whitewater Park focused on revitalizing the river ecosystem while enhancing recreational...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Portland
- OR
Calibre provided structural engineering services for the VA Portland Healthcare System, located in Portland, Oregon....
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Aurora
- CO
Calibre undertook a comprehensive stormwater master planning project for the 1,200-acre Original Aurora area in...
- Pueblo
- CO
Calibre Engineering provided structural design services for the Pueblo Bluffs Multifamily Apartments. Spanning approximately 92,000...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Berthoud
- CO
Located at the southeast corner of Mountain Avenue and Berthoud Parkway in Larimer County, Colorado,...
- Houston
- TX
The Houston Swiftwater Rescue Facility, which spans over 50,000 square feet, seeks to enhance water...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Charlotte
- NC
The National Whitewater Center is the largest and most profitable whitewater park of its kind...
- Box Elder – Rapid City is 10 miles away
- SD
Calibre provided civil design services for an 11,619 square-foot Explosive Ordinance Disposal (EOD) Facility addition...
- Grand Canyon National Park
- AZ
Located in the picturesque North Rim area, this extensive infrastructure project spans vital water and...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)