Portfolio
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Englewood
- CO
In July 2018, Englewood faced unprecedented 100-year flooding events that severely impacted three major basins,...
- Eagle
- CO
Eagle River Park is designed to attract summer visitors and promote outdoor recreation. Situated along...
- Commerce City
- CO
Located in Commerce City, the Settlers Crossing project encompasses 163.39 acres and features 120 single-family...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Commerce City
- CO
Located in Commerce City, the Settlers Crossing project encompasses 163.39 acres and features 120 single-family...
- Commerce City
- CO
This project encompassed the repaving and construction of the parking lot, covering both the existing...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Lyons
- CO
The 2013 Colorado Flood washed away approximately 3,600 square feet of riverfront property of a...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Durango
- CO
The Durango Whitewater Park is one of the country’s most utilized whitewater parks. Calibre’s Whitewater...
- Montgomery
- AL
Nestled along the scenic Alabama River, Montgomery Whitewater spans over 100 acres and serves as...
- Fort Collins
- CO
The Poudre River Park was developed to transform an abandoned diversion structure into a vibrant...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)