Portfolio
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Portland
- OR
Calibre provided structural engineering services for the VA Portland Healthcare System, located in Portland, Oregon....
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Grand Canyon National Park
- AZ
Located in the picturesque North Rim area, this extensive infrastructure project spans vital water and...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- White Sands National Park – Alamogordo is nearest city
- NM
Calibre worked on this rehabilitation project at the historic White Sands Visitor Center. Spanning 8,600...
- Oklahoma City
- OK
Riversport Rapids Whitewater Center is the first pumped-park globally to offer a recreational, a competition,...
- Box Elder – Rapid City is 10 miles away
- SD
Calibre provided civil design services for an 11,619 square-foot Explosive Ordinance Disposal (EOD) Facility addition...
- Mesa Verde National Park – near Cortez
- CO
Located within the historic Chapin Mesa Historic Buildings and National Historic Landmark District, this significant...
- Aurora
- CO
Calibre undertook a comprehensive stormwater master planning project for the 1,200-acre Original Aurora area in...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Commerce City
- CO
Located in Commerce City, the Settlers Crossing project encompasses 163.39 acres and features 120 single-family...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Aurora
- CO
Calibre undertook a comprehensive stormwater master planning project for the 1,200-acre Original Aurora area in...
- Box Elder – Rapid City is 10 miles away
- SD
Calibre provided civil design services for an 11,619 square-foot Explosive Ordinance Disposal (EOD) Facility addition...
- Lyons
- CO
Calibre’s Whitewater Team led the restoration of the Town of Lyons’ park following the devastating...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Cleveland
- OH
Calibre completed a comprehensive assessment of the storm sewer system for the Louis Stokes Cleveland...
- Eagle
- CO
The Town of Eagle Visitors Center Boat Launch was constructed in the fall of 2015...
- Portland
- OR
Calibre provided structural engineering services for the VA Portland Healthcare System, located in Portland, Oregon....
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Tees Barrage
- UK
The Tees Barrage International White Water Centre is a groundbreaking project that showcases our commitment...
- Cañon City
- CO
The Cañon City River Whitewater Park focused on revitalizing the river ecosystem while enhancing recreational...
- Ketchum
- ID
Calibre’s Whitewater Team led the development of the River Park Master Plan in Ketchum, Idaho,...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)