Portfolio
- Berthoud
- CO
Calibre’s structural team worked on the revitalization of Berthoud Town Park, located in the heart...
- Denver
- CO
Calibre proudly contributed to the Capitol Complex Renovations project in Denver, Colorado, focusing on the...
- Lyons
- CO
Bohn Park suffered extensive damage from the 2013 Colorado Flood, which caused record rainfall to...
- Commerce City
- CO
Located in Commerce City, the Settlers Crossing project encompasses 163.39 acres and features 120 single-family...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Nottingham
- UK
The Holme Pierrepont National Watersports Centre is a premier facility that underwent a transformative upgrade...
- Bratislava
- SK
The Čunovo Water Sports Centre in Bratislava, Slovakia, originally built in 1996, hosted its first...
- Aurora
- CO
Calibre undertook a comprehensive stormwater master planning project for the 1,200-acre Original Aurora area in...
- Oklahoma City
- OK
Riversport Rapids Whitewater Center is the first pumped-park globally to offer a recreational, a competition,...
- Cheyenne
- WY
Calibre worked on the expansion and reconfiguration of the Emergency Department (ED) and the creation...
- Grand Canyon National Park
- AZ
Located in the picturesque North Rim area, this extensive infrastructure project spans vital water and...
- Grand Junction
- CO
The Grand Junction VA Medical Center project includes 50,000 square feet of infrastructure. Calibre delivered...
- Littleton
- CO
The Jackass Gulch project encompasses approximately 1,000 acres of critical watershed management. Calibre was contracted...
- Wanaka
- NZ
Calibre’s Whitewater Team led the design and construction of the Camphill Surf Park, a premier...
- Englewood
- CO
Calibre undertook the conceptual layout and cost estimation for a pivotal bridge extending from the...
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Pueblo
- CO
Calibre Engineering provided structural design services for the Pueblo Bluffs Multifamily Apartments. Spanning approximately 92,000...
- Cape Canaveral
- FL
Calibre managed the Phase 2 Expansion of Cape Canaveral National Cemetery in Florida, a significant...
- Montgomery
- AL
Nestled along the scenic Alabama River, Montgomery Whitewater spans over 100 acres and serves as...
- Englewood
- CO
Calibre conducted a comprehensive assessment of a critical CMP and RCP stormwater pipe. The project...
- Denver
- CO
Calibre provided civil engineering services for this redevelopment on a 5.1-acre site, which included renovating...
- Denver
- CO
The Fort Logan National Cemetery Phase 1 Development project encompasses 49.42 contiguous acres, with approximately...
- Nottingham
- UK
The Holme Pierrepont National Watersports Centre is a premier facility that underwent a transformative upgrade...
- Denver
- CO
Located in the heart of downtown Denver, the South Platte River Rehabilitation project spans one...
Where We’ve Worked
International Work
- Bratislava, Slovakia
- Hāwea Flat, New Zealand
- Lee Valley/London (UK)
- Meghalaya, India
- Nassau, Bahamas
- Nottingham (UK)
- Sort, Spain
- Teeside (UK)